How to use Concrete Estimator

  1. Enter the Length and Width in metres.
  2. Enter the Depth in centimetres, for example 10 for a 100 mm slab.
  3. Read the Volume in m³ and the approximate count of 25 kg bags.

How it works

Volume = length × width × (depth ÷ 100), in cubic metres. Bags = volume ÷ 0.017, rounded up, which assumes one 25 kg bag of dry mix yields about 0.017 m³ of concrete.

Example

A 5 m × 4 m slab 10 cm deep is 5 × 4 × 0.1 = 2 m³. At 0.017 m³ per bag that is 117.6, so about 118 bags of 25 kg.

Questions about Concrete Estimator

When is ready-mix cheaper than bags?

Bags suit small jobs such as post holes or a shed base under a cubic metre. At 2 m³ you would be mixing over a hundred bags by hand, which is the point where most people order a truck.

Should I order more than the calculated volume?

Yes. The tool gives the exact geometric volume with no margin. Uneven ground, a sub-base that dips and spillage mean ordering around 5 to 10% more is common practice.